What helps us route your request
State the occupancy, number of modules, storeys and planned delivery window. Include any confirmed site loads and the reference of the engineer’s design basis.
Send a project brief to the DORCE China sourcing desk. This independent procurement service is separate from the original brand and has no authorized dealership relationship.
Start a project enquiry Review the evidence matrixState the occupancy, number of modules, storeys and planned delivery window. Include any confirmed site loads and the reference of the engineer’s design basis.
If site loads or the foundation concept remain open, mark them as pending. We can start a supplier comparison and identify where a provisional assumption affects pricing.
Our coordination region is China. Provide your time zone and preferred reply window so we can arrange any follow-up with your team and shortlisted suppliers.
Use the form for initial project correspondence. Give a work email and your role in the buying process so we can return the relevant scope checklist.
Include external length, width and height if those dimensions are constrained by a road or crane study. Say whether the project needs a relocatable building or a permanent installation and name the destination country.
For modular offices or classrooms, state the finish level and required MEP preinstallation. Identify the field connection points for incoming power, drains, and mechanical services. Clarify whether installation and commissioning should be quoted as optional lines.
For shipping, supply the intended discharge port, site access restrictions and any required consolidation. The forwarder needs the longest package and lifting arrangement before confirming equipment. Route clearance and permits belong with the local carrier.
List drawings by number and revision in the message. The enquiry form accepts a written brief. Keep confidential drawings in your document system until a suitable sharing channel is agreed.
The form below collects your contact details, package scope and project criteria in three steps. Once you have sent the brief, retain your drawing revision and scope list for the follow-up comparison.
Step 1 of 3